Les Rencontres Flotauto Paris 2025

Mob-Energy reinvents on-site recharging

With its Eiko power cube, Mob-Energy is offering a no-work charging solution that can supply up to 25 vehicles with the electrical power normally used by a single charging point. The LOM deadline of 1 January 2025, the greening of fleets, the end of the sale of new combustion-powered cars in 2025... The mass electrification of vehicles is essential to the transition and relies on the rapid development of recharging infrastructures (IRVE). However, uncertainties about current and future needs and the slow pace of deployment are weighing on investment decisions. The fruit of Mob-Energy R&D, Eiko demonstrated its relevance to businesses in 2024: rapid installation (3 days), economical electrical connection (just 37 kVA to charge up to 25 EVs), scalability (new charge points can be added in 24 hours), and the ability to move the IRVE for businesses that rent their sites. After deploying around thirty first-generation Eiko systems in just a few months, Mob-Energy has announced the launch of the second-generation cube in autumn 2024. A new leasing offer Against this backdrop of electrification and the growth of intermittent energy production, Mob-Energy intends to meet the challenges of tomorrow's electricity network, by placing energy management, power optimisation and intelligent energy storage at the heart of its ambitions and its strategy.

Presented by